Progress is coming along nicely at Holton St Mary. We have worked on more elevations. Timber repairs have been carried out and treated with 5-star Cuprinol wood treatment. The building has been insulated with 100mm Sheep's wool insulation and boarded with 25mm Savolit boarding. It has a scratch coat of lime render below in preparation for the lime plaster.